The new manufacturing site: built as part of a sustainable development policy.

The new 5500m² building, made up of three 60 m long naves, groups trades together and contributes to the reduction in handling time thanks to three overhead cranes.
The building was erected following the criteria of the HQE® process (Environmental High Quality). Our priorities were the reduction of energy requirements, air quality, and acoustic and visual comfort, notably thanks to the installation of large high windows.
The attractiveness of the site is real; we wanted it to blend in with the landscape.